{"id":777,"date":"2025-08-25T17:49:05","date_gmt":"2025-08-25T17:49:05","guid":{"rendered":"https:\/\/www.citadel.edu\/ofe\/?page_id=777"},"modified":"2026-03-25T13:07:02","modified_gmt":"2026-03-25T13:07:02","slug":"campus-construction-projects","status":"publish","type":"page","link":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/","title":{"rendered":"Campus Construction Projects"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\" id=\"h-campus-construction\">Campus Construction<\/h2>\n\n\n\n<p>The Citadel is always working to maintain and improve our academic, athletic and non-academic facilities.&nbsp; At any time we have more than a dozen minor and major projects underway \u2013 investing millions of dollars in the Charleston community and improving the on-campus experience for our students, faculty, staff and neighbors.&nbsp;Below is a list of projects currently underway and those in the planning process.&nbsp;&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-bottom is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"has-text-align-center\"><strong><a href=\"#h-ongoing-projects\">Ongoing Projects<\/a><\/strong> \u2022 <strong><a href=\"#h-recently-completed-major-projects\">Recently Completed Major Projects<\/a><\/strong><\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns has-pt-barracks-background-color has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-ongoing-projects\">Ongoing Projects<\/h3>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-summerall-chapel-stained-glass-restoration\">Summerall Chapel Stained Glass Restoration<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Phase I &#8211; Complete<\/li>\n\n\n\n<li>Phase II &#8211; January &#8211; April 2026<\/li>\n\n\n\n<li>Phase III &#8211; January &#8211; April 2027<\/li>\n\n\n\n<li>Phase IV &#8211; January &#8211; April 2028<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>Construction began on the Summerall Chapel in 1936, and the first services were held in 1937. Upon completion, classes through 1944 could purchase and dedicate a window. The lower windows show scenes from Christ\u2019s life and were given by various classes. The upper fa\u00e7ade and transept windows are memorials to individual cadets, and the chancel window is a memorial to cadets who have given their lives in service. The windows are approximately 80 years old and are at a stage where they are in need of repair. The initial project will repair 4 windows that have been identified as some that have the most deterioration, with others to follow in future phases.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Process (for each phase)<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Remove asbestos containing caulk from the interior perimeter of the windows and re\u2010caulk interior\n<ul class=\"wp-block-list\">\n<li>This requires erection of scaffolding, construction of containment on the scaffolding, set\u2010up of a<br>decontamination area for workers, and air monitoring prior to and during all abatement activities.<\/li>\n\n\n\n<li>The re\u2010caulking is done to (a) help stabilize the glass and (b) create a seal around the windows, so the<br>interior environment can be kept clean from asbestos particles while the exterior abatement is done.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Remove exterior protective glazing (\u201cstorm windows\u201d) for access from the exterior\n<ul class=\"wp-block-list\">\n<li>This is required to remove the asbestos containing caulk and to access the stained glass from the<br>exterior for eventual removal.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Remove asbestos containing caulk form the exterior of the windows\n<ul class=\"wp-block-list\">\n<li>This is the last step to prepare the stained\u2010glass windows for eventual removal.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Erect scaffolding or bring a lift inside. A lift will be used outside.<\/li>\n\n\n\n<li>Document each window through photography prior to removal.<\/li>\n\n\n\n<li>Remove the stained\u2010glass windows.\n<ul class=\"wp-block-list\">\n<li>Each window section will be removed intact. The stained\u2010glass company will work from the interior (on<br>scaffolding) and the exterior (on a lift) to remove each window section.<\/li>\n\n\n\n<li>Each section will be placed in a container\/ box to prepare for transport to the stained\u2010glass workshop\/<br>studio.<\/li>\n\n\n\n<li>Installed in the openings will be temporary acrylic panels with images of the windows applied in film, so<br>that the temporary inserts will be translucent and will look like the removed windows.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Restore the Stained\u2010glass Windows\n<ul class=\"wp-block-list\">\n<li>Prior to work on the window sections, the stained\u2010glass company will document the existing condition of<br>the windows, including taking dimensions and doing rubbings.<\/li>\n\n\n\n<li>The stained\u2010glass company will remove the lead that joins the stained\u2010glass pieces, repair any broken<br>glass, and repaint any faded or damaged sections. They will then reassemble and re\u2010lead the stainedglass.<br>In addition, there were bars added to the original windows for stabilization that will be removed,<br>as they have actually caused damage.<\/li>\n\n\n\n<li>Approximately 12 months have been allowed for removal and reinstallation.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Reinstall the Stained\u2010glass Windows\n<ul class=\"wp-block-list\">\n<li>This will require erection of scaffolding inside and the use of the lift outside.<\/li>\n\n\n\n<li>Place each restored window in its container\/ box at the workshop\/ studio for transport back to Summerall Chapel.<\/li>\n\n\n\n<li>Remove the temporary acrylic panels.<\/li>\n\n\n\n<li>Reinstall each window section in its location and caulk.<\/li>\n\n\n\n<li>Install a new protective glazing system on the exterior to protect the restored stained glass.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>Project Number:<\/em><strong> <\/strong>H09\u2010N176\u2010PG, H09\u2010N186\u2010CB, H09\u2010N189\u2010JR<\/li>\n\n\n\n<li><em>Designer of Record: <\/em>McMillan Pazdan Smith Architecture<\/li>\n\n\n\n<li><em>Contract Delivery Method: <\/em>Design\u2010Bid\u2010Build<\/li>\n\n\n\n<li><em>Contractor: <\/em>Huss, Inc. (sub \u2013 Willet Hauser), Shenandoah Restorations, TBD as Phase III is out for bid<\/li>\n\n\n\n<li><em>Total Estimated Square Footage:<\/em> NA<br>A\u20101 Amount (for 4 upper windows per phase): $948,000; $883,515; $967,496; Phase IV is not yet funded<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Additional Work Completed<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Roof Replacement: completed summer 2022: $923,93<\/li>\n\n\n\n<li>Accessible Entrance: completed spring 2024: $397,000<\/li>\n\n\n\n<li>Front door refurbishment (3 sets of double doors): $21,456 (of Accessible Entrance project funds)<\/li>\n\n\n\n<li>Electrical Upgrades and Audio Visual Installation: completed summer 2025: $825,656<\/li>\n\n\n\n<li>Front Column Stone Repair: $9,150<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Additional Future Work<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Chandelier Refurbishment: $90,000 base + $33,000 alternate (2024 costs)<\/li>\n\n\n\n<li>Lighting Controls: $10,000 (design only)<\/li>\n\n\n\n<li>Pew and Kneeler Restoration: $380,000 (2024 costs)<\/li>\n\n\n\n<li>Office Upgrades with ADA Restroom: cost TBD<br>\u2022Interior and Exterior Stone and Plaster Repair: cost TBD<\/li>\n\n\n\n<li>Exterior Envelope Repairs: cost TBD<\/li>\n\n\n\n<li>Artifact and Plaque Organization: $6,700 (funds spent to date on General Summerall artifact relocation and organ plaque installation): overall cost and scope TBD<\/li>\n\n\n\n<li>Back Door Replacement (3 doors): $32,989<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-1024x683.jpg\" alt=\"\" class=\"wp-image-857\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"887\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Photo-Feb-17-2025-8-46-13-AM-768x1024.jpg\" alt=\"\" class=\"wp-image-887\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Photo-Feb-17-2025-8-46-13-AM-768x1024.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Photo-Feb-17-2025-8-46-13-AM-225x300.jpg 225w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Photo-Feb-17-2025-8-46-13-AM-1152x1536.jpg 1152w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Photo-Feb-17-2025-8-46-13-AM-1536x2048.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Photo-Feb-17-2025-8-46-13-AM-scaled.jpg 1920w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"886\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/2025-2-4-Chapel-SG-Windows-4-768x1024.jpg\" alt=\"\" class=\"wp-image-886\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/2025-2-4-Chapel-SG-Windows-4-768x1024.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/2025-2-4-Chapel-SG-Windows-4-225x300.jpg 225w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/2025-2-4-Chapel-SG-Windows-4-1152x1536.jpg 1152w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/2025-2-4-Chapel-SG-Windows-4-1536x2048.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/2025-2-4-Chapel-SG-Windows-4-scaled.jpg 1920w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"586\" height=\"782\" data-id=\"856\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Summerall-Chapel.jpg\" alt=\"\" class=\"wp-image-856\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Summerall-Chapel.jpg 586w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Summerall-Chapel-225x300.jpg 225w\" sizes=\"auto, (max-width: 586px) 100vw, 586px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"858\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541574-1024x683.jpg\" alt=\"\" class=\"wp-image-858\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541574-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541574-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541574-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541574-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541574-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-east-side-stands-replacement\">East Side Stands Replacement<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Contract submission due February 5, 2026. On February 10, an intent to award the contract to Hill Corporation was posted. The contractor has already carefully removed the existing stands. Site prep work is underway. We expect completion by start of 2026 football season.<\/li>\n<\/ul>\n\n\n\n<p>The New East Side Stands project at Johnson Hagood Stadium is intended to remove temporary seats and replace them with more permanent seats and a restroom facility.  The original 10,000 seat East Side were damaged during Hurricane Hugo and eventually torn down years later. In their place 1000 temporary bleacher seats were constructed. The Citadel is not replacing the temporary seats with 2000 permanent seats.  While still below the prior number of available seats, this project will dramatically improve the stadium experience for those on the visitor&#8217;s side of the stadium.  The project is being funded through the generosity of Citadel donors. <\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Construction will involve the removal of existing bleachers from the site, construction of 2000 permanent seats, construction of a restroom building, and associated landscaping and hard scaping.  <\/li>\n\n\n\n<li>There are significant city-mandated stormwater and site preparation requirements for the project that have added to the cost.<\/li>\n\n\n\n<li>The new facility will include restrooms and a filming platform for recording or televising games. <\/li>\n\n\n\n<li>The construction project does not require the driving of piles &#8211; traditionally the loudest element of the construction project &#8211; but will require the installation of earthquake drains.<\/li>\n\n\n\n<li>Contractor: Hill Corporation<\/li>\n\n\n\n<li>Estimated Project Budget (construction, permitting, management, overruns) &#8211; $6.4M<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1.jpeg\" alt=\"\" class=\"wp-image-897\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1.jpeg 2560w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1-300x169.jpeg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1-1024x576.jpeg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1-768x432.jpeg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1-1536x864.jpeg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck6-1-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"896\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck2-1024x576.jpeg\" alt=\"\" class=\"wp-image-896\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck2-1024x576.jpeg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck2-300x169.jpeg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck2-768x432.jpeg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck2-1536x864.jpeg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck2-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"895\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck3-1024x576.jpeg\" alt=\"\" class=\"wp-image-895\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck3-1024x576.jpeg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck3-300x169.jpeg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck3-768x432.jpeg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck3-1536x864.jpeg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck3-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"894\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck4-1024x576.jpeg\" alt=\"\" class=\"wp-image-894\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck4-1024x576.jpeg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck4-300x169.jpeg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck4-768x432.jpeg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck4-1536x864.jpeg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck4-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"893\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck5-1024x576.jpeg\" alt=\"\" class=\"wp-image-893\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck5-1024x576.jpeg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck5-300x169.jpeg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck5-768x432.jpeg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck5-1536x864.jpeg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/AUG19-meeting-slide-deck5-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-letellier-hall-engineering-building-replacement\">LeTellier Hall Engineering Building Replacement<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Vacate existing building and break ground \u2013 late 2026<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>The new Engineering Building will replace LeTellier Hall, which was originally constructed as the building for the School of Engineering in 1936. The building opened in 1937 to support fewer than 60 students. It houses classroom, labs, and offices. Today there are approximately 700 enrolled in day and evening engineering classes. The School of Engineering includes the departments of Civil, Environmental, and Construction Engineering, Electrical and Computer Engineering, Mechanical Engineering, and Engineering Leadership and Program Management. The New Engineering Building will be a state\u2010of\u2010the\u2010art building which will replace aged facilities with modern labs and classrooms to meet current and future needs.<\/p>\n\n\n\n<p>The new facility will create a collaborative environment fostering interactions between departments with collaborative spaces for students and faculty and by integrating spaces for Electrical and Computer Engineering, which is currently located in Grimsley Hall.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project<\/strong> <strong>Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>Project Number: <\/em>H09\u20109625\u2010CB<\/li>\n\n\n\n<li><em>Designer of Record: <\/em>Quackenbush Architects\/ Ayers Saint Gross<\/li>\n\n\n\n<li><em>Contract Delivery Method:<\/em> Construction Manager\u2010at\u2010Risk (CM\u2010R)<\/li>\n\n\n\n<li><em>Contractor: <\/em>Gilbane Building Company<br>Total Program Gross Square Footage (GSF):<br>86,100 SF new + 23,000 SF reno = 109,100 SF<\/li>\n\n\n\n<li><em>Estimated Project Budget: <\/em>$83,765,200 million<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Building Spaces &amp; Facilities<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Learning Spaces (Labs, Capstone, and Student<br>Project Areas):\n<ul class=\"wp-block-list\">\n<li>10 Flat 30 Seat Classrooms (900 SF)<\/li>\n\n\n\n<li>10 Instructional Labs<\/li>\n\n\n\n<li>6 Capstone and Student Project Areas<\/li>\n\n\n\n<li>3 Computer Labs<\/li>\n\n\n\n<li>1 RAVR Lab*<\/li>\n\n\n\n<li>1 AI Lab*<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Offices:\n<ul class=\"wp-block-list\">\n<li>1 Dean (250 SF)<\/li>\n\n\n\n<li>4 Department Heads (180 SF)<\/li>\n\n\n\n<li>45 Faculty\/Staff Offices (120 SF)<\/li>\n\n\n\n<li>10 Workstations<\/li>\n\n\n\n<li>2 Large Conference Rooms<\/li>\n\n\n\n<li>2 Medium Conference Rooms<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Additional Spaces:\n<ul class=\"wp-block-list\">\n<li>1 Learning Theater*<\/li>\n\n\n\n<li>1 Flexible Research Lab<\/li>\n\n\n\n<li>15 Lab Support, Shop, and Storage Spaces<br>(including shop spaces for wood and metal, welding,<br>and 3\u2010D printing)<\/li>\n\n\n\n<li>Collaboration Spaces for 4\u20106+ Occupants (distributed<br>throughout building)<\/li>\n\n\n\n<li>Dean\u2019s Suite<\/li>\n\n\n\n<li>Exterior Work Space (patio outside of labs)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1284\" height=\"956\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/SW-v1_cropped.png\" alt=\"\" class=\"wp-image-884\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/SW-v1_cropped.png 1284w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/SW-v1_cropped-300x223.png 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/SW-v1_cropped-1024x762.png 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/SW-v1_cropped-768x572.png 768w\" sizes=\"auto, (max-width: 1284px) 100vw, 1284px\" \/><\/figure>\n\n\n\n<p><\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-krause-school-of-leadership-and-ethics-renovation-and-addition\">Krause School of Leadership and Ethics Renovation and Addition<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completion Fall 2026<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>Originally constructed in 1936, 201\u2013204 Richardson Ave is a two-story building comprised of four units, totaling 9,938 GSF. The building once served as faculty housing, is currently being used as office space. The scope of this project encompasses a single-story 2,280 GSF building addition, as well as a renovation of 201-203 Richardson, with code upgrades to 204 Richardson. The exterior finish of the building will be stucco to match the existing units, aluminum storefront window openings, and a low-slope roof. The addition will be on the north side, will house the Innovation Lab and associated spaces.<\/p>\n\n\n\n<p>This project is under construction with Harper General Contractors. This project establishes the home for the Krause School of Leadership and Ethics. Our collective vision is to be the pre-eminent School of Leadership and Ethics. This renovation &amp; addition will further our goals by transforming the interior into an open, contemporary space for faculty, staff, and students, that is set apart from its former use as housing.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>State Project Number: <\/em>H09-9626-PG<\/li>\n\n\n\n<li><em>Project Status:<\/em> In Construction<\/li>\n\n\n\n<li><em>Designer of Record: <\/em>GBA Architecture<\/li>\n\n\n\n<li><em>Contract Delivery Method: <\/em>Design-Bid-Build<\/li>\n\n\n\n<li><em>Contractor: <\/em>Harper General Contractors<\/li>\n\n\n\n<li><em>Approved A-1 Project Budget:<\/em> $3,753,270<\/li>\n\n\n\n<li><em>Total Project SF: <\/em>12,218 [Renovation (201-204 Richardson): 9,938 SF + Addition: 2,280 SF]<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1047\" height=\"532\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Krause-Reno_Addn-2025-9-26-2.jpeg\" alt=\"\" class=\"wp-image-833\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Krause-Reno_Addn-2025-9-26-2.jpeg 1047w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Krause-Reno_Addn-2025-9-26-2-300x152.jpeg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Krause-Reno_Addn-2025-9-26-2-1024x520.jpeg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Krause-Reno_Addn-2025-9-26-2-768x390.jpeg 768w\" sizes=\"auto, (max-width: 1047px) 100vw, 1047px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1270\" height=\"672\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/krause-center-project.png\" alt=\"\" class=\"wp-image-1004\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/krause-center-project.png 1270w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/krause-center-project-300x159.png 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/krause-center-project-1024x542.png 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/krause-center-project-768x406.png 768w\" sizes=\"auto, (max-width: 1270px) 100vw, 1270px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-stevens-barracks-renovation\">Stevens Barracks Renovation<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Phase I \u2013 August 2024<\/li>\n\n\n\n<li>Phase II \u2013 August 2025<\/li>\n\n\n\n<li>Phase III \u2013 August 2026<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>This project seeks to renovate Stevens Barracks for longevity. The project will replace the doors, electrical system, HVAC systems and plumbing components. The project will also renovate the fire sprinkler system and finishes in cadet rooms. The project will replace existing steam distribution lines as required. It will also renovate the campus chilled water system which supports the barracks and Coward Hall. In Summer 2024 and 2025, 141 cadet rooms were renovated. The remaining rooms will be renovated in Summer 2026.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>Project Number: <\/em>H09\u20109623\u2010ML<\/li>\n\n\n\n<li><em>Total Square Footage:<\/em> 86,000 SF<\/li>\n\n\n\n<li><em>Phase II Approved A\u20101: <\/em>$23,962,000<\/li>\n\n\n\n<li><em>Designer of Record: <\/em>Davis and Floyd<\/li>\n\n\n\n<li><em>Contract Delivery Method:<\/em> Construction Manager\u2010at\u2010Risk (CM\u2010R)<\/li>\n\n\n\n<li><em>Contractor:<\/em> Thompson Turner Construction<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1112\" height=\"746\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens1.png\" alt=\"\" class=\"wp-image-866\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens1.png 1112w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens1-300x201.png 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens1-1024x687.png 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens1-768x515.png 768w\" sizes=\"auto, (max-width: 1112px) 100vw, 1112px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"868\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens2-1-1024x682.png\" alt=\"\" class=\"wp-image-868\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens2-1-1024x682.png 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens2-1-300x200.png 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens2-1-768x512.png 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Stevens2-1.png 1114w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-thompson-hall-replacement-construction\">Thompson Hall Replacement Construction<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>TBD (Planning phase)<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>The original Thompson Hall was built in 1938 and the current building was constructed in 2001. Today, its facilities do not meet the demands of the foundational Mathematics Department and the nationally recognized Cyber and Computer Sciences Department, which require a state\u2010of\u2010the\u2010art facility. Overall Thompson Hall is in good condition however, major upgrades to the building will require bringing the building up to current building code standards. These include, but are not limited to, accessibility clearances, structural lateral resistance systems, and life safety systems. Thompson Hall\u2019s south elevation forms one section of the historic fa\u00e7ade fronting Summerall Field and is planned to be preserved<br>during renovations. The building would be expanded with an addition to the north.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Building Spaces &amp; Facilities<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Learning Spaces (Labs and Classrooms):\n<ul class=\"wp-block-list\">\n<li>9 Flat 30 Seat Classrooms (900 SF)<\/li>\n\n\n\n<li>2 Computer Labs<\/li>\n\n\n\n<li>1 SOC Lab<\/li>\n\n\n\n<li>8 Research Labs<\/li>\n\n\n\n<li>4 Research Lab Support Areas<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Offices:\n<ul class=\"wp-block-list\">\n<li>2 Department Heads (180 SF)<\/li>\n\n\n\n<li>37 Faculty\/Staff Offices (120 SF)<\/li>\n\n\n\n<li>21 Workstations<\/li>\n\n\n\n<li>3 Conference Rooms<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Additional Spaces:\n<ul class=\"wp-block-list\">\n<li>1 Multipurpose Lab<\/li>\n\n\n\n<li>2 Cyber Ranges<\/li>\n\n\n\n<li>Collaboration Spaces for 4\u20108 Occupants<br>(distributed throughout building)<\/li>\n\n\n\n<li>Lobby Exhibit Space<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"597\" height=\"376\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Thompson-Hall_2025-09-25.jpeg\" alt=\"\" class=\"wp-image-877\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Thompson-Hall_2025-09-25.jpeg 597w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-Thompson-Hall_2025-09-25-300x189.jpeg 300w\" sizes=\"auto, (max-width: 597px) 100vw, 597px\" \/><\/figure>\n\n\n\n<p><\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns has-pt-barracks-background-color has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-recently-completed-major-projects\">Recently Completed Major Projects<\/h3>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-mark-clark-hall-canteen-renovation\">Mark Clark Hall Canteen Renovation<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completed Summer 2025<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>The Canteen area in Mark Clark Hall houses a Chick\u2010Fil\u2010A location and another separate vendor location. The second vendor space was renovated in 2025 to update the layout to provide more work area and a more streamlined order experience. The finishes were updated for a fresh look that also aligns with campus standards and compliments the existing Chick\u2010Fil\u2010A area. A patio was added on the north side to expand the dining area and offer other seating options.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>Project Number:<\/em> IH\u2010679<\/li>\n\n\n\n<li><em>Designer of Record: <\/em>Vision Builders Design<br>Contract Delivery<\/li>\n\n\n\n<li><em>Method:<\/em> Design\u2010Bid\u2010Build<\/li>\n\n\n\n<li><em>Contractor: <\/em>American Constructions Services, LLC<\/li>\n\n\n\n<li><em>Renovated Area: <\/em>Approximately 1,200 SF<\/li>\n\n\n\n<li><em>Timeline\/Schedule: <\/em>Completed Summer 2025<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"739\" height=\"557\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-MCH-Canteen_2025-09-26-2.jpeg\" alt=\"\" class=\"wp-image-861\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-MCH-Canteen_2025-09-26-2.jpeg 739w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/One-Pager-MCH-Canteen_2025-09-26-2-300x226.jpeg 300w\" sizes=\"auto, (max-width: 739px) 100vw, 739px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-4 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"998\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC4837-1024x683.jpg\" alt=\"\" class=\"wp-image-998\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC4837-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC4837-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC4837-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC4837-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC4837-2048x1366.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"999\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0059-1024x683.jpg\" alt=\"\" class=\"wp-image-999\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0059-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0059-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0059-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0059-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0059-2048x1366.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"1000\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0052-1024x683.jpg\" alt=\"\" class=\"wp-image-1000\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0052-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0052-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0052-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0052-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20251210_Campus-Buildings_0052-2048x1366.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-water-tower\">Water Tower<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completed Summer 2025<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>The Citadel utilizes a central fire pump and water storage system to provide fire protection coverage to the buildings on campus. The existing fire water tank and elevated water tower were installed in 1953 and are in poor condition. Based on a tank inspection completed in November 2020, The Citadel initiated a study for an in\u2010house project to replace the tank. The Study was finalized in February 2022, and indicated a new tank was needed and that the existing fire pump, which was installed in 2001, no longer has capacity to meet current codes for necessary fire water flow for the campus. This project will construct a new 200,000 gallon water storage tank and a new pump house to house a new fire pump that meets the necessary flow criteria. Once complete, the existing water tank, water tower and pump house will be demolished.<\/p>\n\n\n\n<p>The Citadel considered refurbishing the existing tank and replacing the existing pump. This was found to not be feasible due to the poor condition of the tank and the level of repairs required. The tank material is highly corroded inside and out. The tank also has a large amount of silt and sediment in the bottom which has the potential to be sucked into the system in a fire event and could clog sprinkler heads. Additionally, the tank does not meet current OSHA and NFPA safety standards for fire water storage facilities during renovations. The building would be expanded with an addition to the north.<\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>Project Number: <\/em>H09\u20109624\u2010ML<\/li>\n\n\n\n<li><em>Phase II Approved A\u20101: <\/em>$2,550,000<\/li>\n\n\n\n<li><em>Designer of Record: <\/em>DWG\/ADC Engineering<\/li>\n\n\n\n<li><em>Contract Delivery Method:<\/em> Design\u2010Bid\u2010Build<\/li>\n\n\n\n<li><em>Contractor: <\/em>Bohicket Construction<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"346\" height=\"465\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Water-Tower-2.png\" alt=\"\" class=\"wp-image-852\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Water-Tower-2.png 346w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/Water-Tower-2-223x300.png 223w\" sizes=\"auto, (max-width: 346px) 100vw, 346px\" \/><\/figure>\n\n\n\n<p><\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-capers-hall-construction\">Capers Hall Construction<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completed Summer 2023<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Project Details<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li><em>Project Number:<\/em> H09\u20109611\u2010PG<\/li>\n\n\n\n<li><em>Contract Type:<\/em> Construction Manager @ Risk (CM\u2010R)<\/li>\n\n\n\n<li><em>Contractor:<\/em> Thompson Turner<\/li>\n\n\n\n<li><em>Designer of Record:<\/em> Woolpert, Inc.<\/li>\n\n\n\n<li><em>Total Square Footage:<\/em> 107,700 SF<\/li>\n\n\n\n<li><em>Project Budget:<\/em> $67M<\/li>\n\n\n\n<li><em>Project Completion: <\/em>Summer 2023<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\"><strong>Building Spaces &amp; Facilities<\/strong><\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<ul class=\"wp-block-list\">\n<li>Classrooms &amp; Specialty Learning Spaces:\n<ul class=\"wp-block-list\">\n<li>Thirty (28) 28\u2010person<\/li>\n\n\n\n<li>Two (2) 26 Person Flexible Rooms<\/li>\n\n\n\n<li>One (1) 28\u2010person Computer Lab<\/li>\n\n\n\n<li>Cyber Range &amp; Cyber Lab<\/li>\n\n\n\n<li>Art Studio<\/li>\n\n\n\n<li>National Security Classroom<\/li>\n\n\n\n<li>Center for Inclusive Excellence &amp; Center for International &amp; Special Programs Classroom<\/li>\n\n\n\n<li>250 Seat Performing Arts Auditorium<\/li>\n\n\n\n<li>Psychology Interview Rooms<\/li>\n\n\n\n<li>Training Sensitive Compartmented Information Facility<\/li>\n\n\n\n<li>Legal Studies Classroom<\/li>\n\n\n\n<li>Digital Media Classroom<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Offices:\n<ul class=\"wp-block-list\">\n<li>97+ Offices\n<ul class=\"wp-block-list\">\n<li>Dean\u2019s Suite<\/li>\n\n\n\n<li>Department Heads\/Directors<\/li>\n\n\n\n<li>Faculty\/Staff Spaces<\/li>\n\n\n\n<li>13 Work spaces in multi\u2010person<br>offices<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Additional Spaces:\n<ul class=\"wp-block-list\">\n<li>Three\u2010Story Flag Atrium<\/li>\n\n\n\n<li>Student Commons<\/li>\n\n\n\n<li>Collaborative and Event Areas<\/li>\n\n\n\n<li>Courtyard<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-scaled.jpg\" alt=\"\" class=\"wp-image-869\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-scaled.jpg 2560w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC9414-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-5 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"871\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20241116_Arts_Dance_0158-1024x683.jpg\" alt=\"\" class=\"wp-image-871\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20241116_Arts_Dance_0158-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20241116_Arts_Dance_0158-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20241116_Arts_Dance_0158-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20241116_Arts_Dance_0158-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20241116_Arts_Dance_0158-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"870\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20250122_Snow-Day_0086-1024x683.jpg\" alt=\"\" class=\"wp-image-870\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20250122_Snow-Day_0086-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20250122_Snow-Day_0086-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20250122_Snow-Day_0086-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20250122_Snow-Day_0086-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20250122_Snow-Day_0086-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h5 class=\"wp-block-heading\" id=\"h-bastin-hall-construction\">Bastin Hall Construction<\/h5>\n\n\n\n<p>Timeline<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completed Summer 2020<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-scaled.jpg\" alt=\"\" class=\"wp-image-872\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-scaled.jpg 2560w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC0999-Edit-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-6 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"875\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20210721_CP_USCG_015-1024x683.jpg\" alt=\"\" class=\"wp-image-875\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20210721_CP_USCG_015-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20210721_CP_USCG_015-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20210721_CP_USCG_015-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20210721_CP_USCG_015-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20210721_CP_USCG_015-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"873\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC00573-1024x683.jpg\" alt=\"\" class=\"wp-image-873\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC00573-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC00573-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC00573-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC00573-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/DSC00573-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"874\" src=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20211026_CP_Painting_032-1024x683.jpg\" alt=\"\" class=\"wp-image-874\" srcset=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20211026_CP_Painting_032-1024x683.jpg 1024w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20211026_CP_Painting_032-300x200.jpg 300w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20211026_CP_Painting_032-768x512.jpg 768w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20211026_CP_Painting_032-1536x1024.jpg 1536w, https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/20211026_CP_Painting_032-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n","protected":false},"excerpt":{"rendered":"<p>Campus Construction The Citadel is always working to maintain and improve our academic, athletic and non-academic facilities.&nbsp; At any time we have more than a dozen minor and major projects underway \u2013 investing millions of dollars in the Charleston community and improving the on-campus experience for our students, faculty, staff and neighbors.&nbsp;Below is a list [&hellip;]<\/p>\n","protected":false},"author":694,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","footnotes":""},"class_list":["post-777","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.8 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Campus Construction Projects - Office of Facilities &amp; Engineering<\/title>\n<meta name=\"description\" content=\"Explore The Citadel&#039;s campus construction projects.\" \/>\n<meta name=\"robots\" content=\"noindex, nofollow\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Campus Construction Projects\" \/>\n<meta property=\"og:description\" content=\"Explore The Citadel&#039;s campus construction projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Office of Facilities &amp; Engineering\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-25T13:07:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/\",\"name\":\"Campus Construction Projects - Office of Facilities & Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/wp-content\\\/uploads\\\/sites\\\/144\\\/2025\\\/12\\\/17SEPT25_russ_BULD_CHAPEL_2541579-1024x683.jpg\",\"datePublished\":\"2025-08-25T17:49:05+00:00\",\"dateModified\":\"2026-03-25T13:07:02+00:00\",\"description\":\"Explore The Citadel's campus construction projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/wp-content\\\/uploads\\\/sites\\\/144\\\/2025\\\/12\\\/17SEPT25_russ_BULD_CHAPEL_2541579-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/wp-content\\\/uploads\\\/sites\\\/144\\\/2025\\\/12\\\/17SEPT25_russ_BULD_CHAPEL_2541579-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/campus-construction-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/#website\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/\",\"name\":\"Office of Facilities & Engineering\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.citadel.edu\\\/ofe\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Campus Construction Projects - Office of Facilities & Engineering","description":"Explore The Citadel's campus construction projects.","robots":{"index":"noindex","follow":"nofollow"},"og_locale":"en_US","og_type":"article","og_title":"Campus Construction Projects","og_description":"Explore The Citadel's campus construction projects.","og_url":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/","og_site_name":"Office of Facilities & Engineering","article_modified_time":"2026-03-25T13:07:02+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/","url":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/","name":"Campus Construction Projects - Office of Facilities & Engineering","isPartOf":{"@id":"https:\/\/www.citadel.edu\/ofe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/#primaryimage"},"image":{"@id":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-1024x683.jpg","datePublished":"2025-08-25T17:49:05+00:00","dateModified":"2026-03-25T13:07:02+00:00","description":"Explore The Citadel's campus construction projects.","breadcrumb":{"@id":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/#primaryimage","url":"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-scaled.jpg","contentUrl":"https:\/\/www.citadel.edu\/ofe\/wp-content\/uploads\/sites\/144\/2025\/12\/17SEPT25_russ_BULD_CHAPEL_2541579-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/www.citadel.edu\/ofe\/campus-construction-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.citadel.edu\/ofe\/"},{"@type":"ListItem","position":2,"name":"Campus Construction Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.citadel.edu\/ofe\/#website","url":"https:\/\/www.citadel.edu\/ofe\/","name":"Office of Facilities & Engineering","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.citadel.edu\/ofe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/pages\/777","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/users\/694"}],"replies":[{"embeddable":true,"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/comments?post=777"}],"version-history":[{"count":120,"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/pages\/777\/revisions"}],"predecessor-version":[{"id":1084,"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/pages\/777\/revisions\/1084"}],"wp:attachment":[{"href":"https:\/\/www.citadel.edu\/ofe\/wp-json\/wp\/v2\/media?parent=777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}