{"id":721,"date":"2021-11-09T14:40:00","date_gmt":"2021-11-09T19:40:00","guid":{"rendered":"https:\/\/www.citadel.edu\/magazine-2021\/?p=721"},"modified":"2024-08-12T14:40:55","modified_gmt":"2024-08-12T18:40:55","slug":"capers-replacement-coming-soon","status":"publish","type":"post","link":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/","title":{"rendered":"Capers Replacement Coming Soon"},"content":{"rendered":"\n<p>After 69 years,\nCapers Hall has come down. The 75,000-square-foot building was demolished to\nmake room for a modern academic building to house the School of Humanities and\nSocial Sciences. The new facility is scheduled to be completed in two years. <\/p>\n\n\n\n<p>The\n108,000-square-foot replacement will house classrooms, a performing arts\nauditorium, an art gallery and a computer lab for the Center for Cyber, Intelligence\nand Security Studies.<\/p>\n\n\n\n<p>The Capers Hall\nReplacement Project comes with a price tag of $67 million. <br>\nThe South Carolina General Assembly provided $15 million to assist with the\nproject, and several donors have stepped forward with generous gifts.<\/p>\n\n\n\n<p>The architectural\ndesign will align with the iconic design elements of other campus structures,\nincorporating both traditional and transitional elements in the three-story\nfacility.<\/p>\n\n\n\n<p>&nbsp;\u201cWe are having the concrete, masonry and stucco material, recovered from the demolition, crushed and recycled so that we can use it to build the new site foundation and parking area,\u201d said retired U.S. Navy Commander Jeff Lamberson, \u201985, vice president for facilities and engineering. \u201cThe metal from the old facility will be recycled. There are also some distinctive lighting and ironwork features that will be repurposed.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-embed-youtube wp-block-embed is-type-video is-provider-youtube wp-embed-aspect-4-3 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"The Citadel Live Stream\" width=\"640\" height=\"480\" src=\"https:\/\/www.youtube.com\/embed\/NQOXUZz6csM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>After 69 years, Capers Hall has come down. The 75,000-square-foot building was demolished to make room for a modern academic building to house the School of Humanities and Social Sciences. The new facility is scheduled to be completed in two years. The 108,000-square-foot replacement will house classrooms, a performing arts auditorium, an art gallery and [&hellip;]<\/p>\n","protected":false},"author":694,"featured_media":641,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-721","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-other"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.8 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capers Replacement Coming Soon - The Citadel Magazine 2021<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capers Replacement Coming Soon\" \/>\n<meta property=\"og:description\" content=\"After 69 years, Capers Hall has come down. The 75,000-square-foot building was demolished to make room for a modern academic building to house the School of Humanities and Social Sciences. The new facility is scheduled to be completed in two years. The 108,000-square-foot replacement will house classrooms, a performing arts auditorium, an art gallery and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/\" \/>\n<meta property=\"og:site_name\" content=\"The Citadel Magazine 2021\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-09T19:40:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-12T18:40:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.citadel.edu\/magazine-2021\/wp-content\/uploads\/sites\/211\/Capers-Replacement-Render.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1620\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Web Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Web Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/\"},\"author\":{\"name\":\"Web Admin\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/#\\\/schema\\\/person\\\/a36c2cfc4450a1df19b02eab76ed8573\"},\"headline\":\"Capers Replacement Coming Soon\",\"datePublished\":\"2021-11-09T19:40:00+00:00\",\"dateModified\":\"2024-08-12T18:40:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/\"},\"wordCount\":203,\"image\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/wp-content\\\/uploads\\\/sites\\\/211\\\/Capers-Replacement-Render.jpg\",\"articleSection\":[\"Other\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/\",\"name\":\"Capers Replacement Coming Soon - The Citadel Magazine 2021\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/wp-content\\\/uploads\\\/sites\\\/211\\\/Capers-Replacement-Render.jpg\",\"datePublished\":\"2021-11-09T19:40:00+00:00\",\"dateModified\":\"2024-08-12T18:40:55+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/#\\\/schema\\\/person\\\/a36c2cfc4450a1df19b02eab76ed8573\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/wp-content\\\/uploads\\\/sites\\\/211\\\/Capers-Replacement-Render.jpg\",\"contentUrl\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/wp-content\\\/uploads\\\/sites\\\/211\\\/Capers-Replacement-Render.jpg\",\"width\":1620,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/2021\\\/11\\\/capers-replacement-coming-soon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capers Replacement Coming Soon\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/#website\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/\",\"name\":\"The Citadel Magazine 2021\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/#\\\/schema\\\/person\\\/a36c2cfc4450a1df19b02eab76ed8573\",\"name\":\"Web Admin\",\"url\":\"https:\\\/\\\/www.citadel.edu\\\/magazine-2021\\\/author\\\/kkozane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capers Replacement Coming Soon - The Citadel Magazine 2021","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/","og_locale":"en_US","og_type":"article","og_title":"Capers Replacement Coming Soon","og_description":"After 69 years, Capers Hall has come down. The 75,000-square-foot building was demolished to make room for a modern academic building to house the School of Humanities and Social Sciences. The new facility is scheduled to be completed in two years. The 108,000-square-foot replacement will house classrooms, a performing arts auditorium, an art gallery and [&hellip;]","og_url":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/","og_site_name":"The Citadel Magazine 2021","article_published_time":"2021-11-09T19:40:00+00:00","article_modified_time":"2024-08-12T18:40:55+00:00","og_image":[{"width":1620,"height":1080,"url":"https:\/\/www.citadel.edu\/magazine-2021\/wp-content\/uploads\/sites\/211\/Capers-Replacement-Render.jpg","type":"image\/jpeg"}],"author":"Web Admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Web Admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#article","isPartOf":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/"},"author":{"name":"Web Admin","@id":"https:\/\/www.citadel.edu\/magazine-2021\/#\/schema\/person\/a36c2cfc4450a1df19b02eab76ed8573"},"headline":"Capers Replacement Coming Soon","datePublished":"2021-11-09T19:40:00+00:00","dateModified":"2024-08-12T18:40:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/"},"wordCount":203,"image":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#primaryimage"},"thumbnailUrl":"https:\/\/www.citadel.edu\/magazine-2021\/wp-content\/uploads\/sites\/211\/Capers-Replacement-Render.jpg","articleSection":["Other"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/","url":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/","name":"Capers Replacement Coming Soon - The Citadel Magazine 2021","isPartOf":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#primaryimage"},"image":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#primaryimage"},"thumbnailUrl":"https:\/\/www.citadel.edu\/magazine-2021\/wp-content\/uploads\/sites\/211\/Capers-Replacement-Render.jpg","datePublished":"2021-11-09T19:40:00+00:00","dateModified":"2024-08-12T18:40:55+00:00","author":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/#\/schema\/person\/a36c2cfc4450a1df19b02eab76ed8573"},"breadcrumb":{"@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#primaryimage","url":"https:\/\/www.citadel.edu\/magazine-2021\/wp-content\/uploads\/sites\/211\/Capers-Replacement-Render.jpg","contentUrl":"https:\/\/www.citadel.edu\/magazine-2021\/wp-content\/uploads\/sites\/211\/Capers-Replacement-Render.jpg","width":1620,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.citadel.edu\/magazine-2021\/2021\/11\/capers-replacement-coming-soon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.citadel.edu\/magazine-2021\/"},{"@type":"ListItem","position":2,"name":"Capers Replacement Coming Soon"}]},{"@type":"WebSite","@id":"https:\/\/www.citadel.edu\/magazine-2021\/#website","url":"https:\/\/www.citadel.edu\/magazine-2021\/","name":"The Citadel Magazine 2021","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.citadel.edu\/magazine-2021\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.citadel.edu\/magazine-2021\/#\/schema\/person\/a36c2cfc4450a1df19b02eab76ed8573","name":"Web Admin","url":"https:\/\/www.citadel.edu\/magazine-2021\/author\/kkozane\/"}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/posts\/721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/users\/694"}],"replies":[{"embeddable":true,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/comments?post=721"}],"version-history":[{"count":1,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/posts\/721\/revisions"}],"predecessor-version":[{"id":722,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/posts\/721\/revisions\/722"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/media\/641"}],"wp:attachment":[{"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/media?parent=721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/categories?post=721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.citadel.edu\/magazine-2021\/wp-json\/wp\/v2\/tags?post=721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}